Monday 31 August 2015

Australia: Transerv Energy sidetracks Warro-5 well due to mechanical problems

Otmane El Rhazi from Energy-pedia regional news: Central & SE Asia / Australasia.

Transerv Energy has announced that the present operation at Warro-5, the first well of a pivotal two-well drilling program aimed at unlocking the potentially immense value of Australia’s biggest undeveloped onshore gas field in the mid-west of WA, is drilling ahead at 1857mRT TVD in a side track hole (Warro-5ST).

No comments:

Post a Comment