Otmane El Rhazi from Energy-pedia regional news: Central & SE Asia / Australasia.
Cooper Energy has advised that the second sidetrack of the Bunian-3 development well has reached a total depth of 1,598 metres and preparations to run production casing are underway.
Cooper Energy has advised that the second sidetrack of the Bunian-3 development well has reached a total depth of 1,598 metres and preparations to run production casing are underway.
No comments:
Post a Comment