Sunday 15 March 2015

Australia: Origin Energy spuds first of two new production wells at BassGas

Otmane El Rhazi from Energy-pedia regional news: Central & SE Asia / Australasia.



Origin Energy, as Operator of the BassGas Joint Venture, has confirmed that the Yolla-5 production well spudded on 14 March 2015. The Yolla-5 and Yolla-6 wells are being drilled as part of Stage 2 of the BassGas Mid Life Enhancement (MLE) project.

No comments:

Post a Comment